DIVISION 1 - GENERAL REQUIREMENTS


    01010 SUMMARY OF WORK Under Other Contracts Future Work Work Covered by Contract Documents Contracts Future Work Work Sequence Contractor Use of Promises Occupancy requirements Products Ordered in Advance Owner Furnished Products
    01020 ALLOWANCES -021 Cash Allowances Product Allowances Installation Allowances nspection and Testing Allowances Contingency Allowances -024 Quantity Allowances
    01025 MEASUREMENT AND PAYMENT Schedule of Values Applications for Payment Unit Prices
    01030 ALTERNATES/ ALTERNATIVES
    01035 MODIFICATION PROCEDURES Change Orders Instructions Field Orders Directives
    01040 COORDINATION -041 Project Coordination -042 Mechanical and Electrical Coordination -043 Job Site Administration -045 Cutting and Patching
    01050 FIELD ENGINEERING
    01060 REGULATORY REQUIREMENTS
    01080 IDENTIFICATION SYSTEMS
    01090 REFERENCES -091 Reference Standards -092 Abbreviations -093 Symbols -094 Definitions
    01100 SPECIAL PROJECT PROCEDURES Airport Project Procedures Alteration Project Procedures Detention Project Procedures Environmental Protection Procedures Ground Transportation Project Procedures Hazardous Material Procedures Hospital Project Procedures Industrial Project Procedures Nuclear Project Procedures Preservation and Restoration Project Procedures Radiation Protection Procedures Security Project Procedures Shopping Mall Project Procedures
    01200 PROJECT MEETINGS -210 Preconstruction Conferences -220 Progress Meetings -245 Installation Meetings
    01300 SUBMITTALS -310 Progress Schedules Network Analysis Schedule -320 Progress Reports -330 Survey and Layout Data -340 Shop Drawings, Product Data, and Samples -360 Quality Control Submittals Design Data Test Reports Certificates Manufacturers Instructions -380 Construction Photographs
    01400 QUALITY CONTROL -410 Testing Laboratory Services -420 Inspection Services -425 Field Samples -430 Mock-Ups -440 Contractor's Quality Control -445 Manufacturer's Field Services
    01500 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS -505 Mobilization -510 Temporary Utilities Temporary Electricity Temporary Lighting Temporary Heating, Cooling, and Ventilating Temporary Telephone Temporary Water Temporary Sanitary Facilities Temporary Fire Protection -520 Temporary Construction Temporary Bridges Temporary Docking Temporary Overpasses Temporary Runarounds -525 Construction Aids Construction Elevators, Hoists, and Cranes Scaffolding and Platforms Swing Staging Temporary Enclosures First Aid -530 Barriers and Enclosures Barricades Fences Tree and Plant Protection -540 Security Protection of Work and Property -550 Access Roads and Parking Areas Access Roads Parking Areas -560 Temporary Controls Construction Cleaning Dust Control Erosion and Sediment Control Noise Control Pest Control Pollution Control Rodent Control Surface Water Control -570 Traffic Regulation Construction Parking Control Flagmen Flares and Lights Haul Routes Traffic Signals -580 Project Identification and Signs -590 Field Offices and Sheds
    01600 MATERIAL AND EQUIPMENT -610 Delivery, Storage, and Handling Packing Shipping Unloading and Acceptance Protection -620 Installation Standards -630 Product Options and Substitutions
    01650 FACILITY STARTUP COMMISSIONING -655 Starting of -Systems -660 Testing, Adjusting, and Balancing of Systems -670 Systems Demonstrations
    01700 CONTRACT CLOSEOUT -710 Final Cleaning -720 Project Record Documents -730 Operation and Maintenance Data Operation Manuals Maintenance Instructions -740 Warranties and Bonds -750 Spare Parts and Maintenance Materials -760 Warranty Inspections
    01800 MAINTENANCE